Mistakes to Avoid When Selecting a House Plan in Kenya

Property Valuation Services in Nyamira

Mistakes to Avoid When Selecting a House Plan in Kenya

Avoid costly errors when choosing a house plan in Kenya. This guide highlights the most common mistakes, step-by-step checks, budget and regulatory traps, and a practical checklist to choose a buildable, future-proof plan that fits your lifestyle and county rules.

Introduction

Contents hide

Mistakes to Avoid When Selecting a House Plan in Kenya

Choosing the right house plan in Kenya is one of the biggest decisions before you build. A poor choice can lead to unnecessary costs, delays, or even rejected approvals. This guide highlights the mistakes when choosing house plans in Kenya and shows you how to pick a design that fits your lifestyle, county rules, and budget.

By following these tips, you’ll save time, reduce risks, and make sure your dream home becomes a smooth, successful project from plan to completion.

Why Choosing the Right House Plan Matters in Kenya

Selecting a suitable house plan in Kenya isn’t just about looks — it’s about aligning design, function, and compliance. A well-chosen plan ensures your project stays within budget, meets county requirements, and supports future growth. Ignoring these factors can cost you far more than the plan itself.

Direct Costs of a Wrong Plan (Build Cost Rises, Wasted Approvals)

A poorly selected plan can lead to expensive construction changes. Once you start building, adjustments to walls, roofing, or plumbing layouts can quickly push your budget beyond the limit. You might also face approval rejections from your county office if the plan fails to meet zoning or building standards — forcing you to redraw and resubmit, losing both time and money.

To avoid this:

  • Confirm county by-laws before buying or approving the plan.
  • Get a Quantity Surveyor (QS) estimate to match plan size and budget.
  • Request your architect to adapt the plan to your specific plot and soil conditions.

Indirect Costs (Resale, Rental Appeal, Maintenance)

Even when the house is complete, a wrong plan can hurt your long-term returns. Homes with awkward layouts or limited light often attract fewer buyers or tenants, reducing resale and rental appeal. Poor ventilation and sun orientation can also increase maintenance and energy costs over time.

To build long-term value:

  • Choose plans with good natural light and airflow.
  • Consider flexible room layouts for rental or resale purposes.

Ask your designer to include low-maintenance materials and roof designs suited to Kenya’s climate.

Mistakes to Avoid When Selecting a House Plan in Kenya

How Kenyan Context Changes Plan Choice (Plot, Climate, County Bylaws)

Every plot in Kenya comes with its own realities — soil type, slope, weather, and county regulations. Ignoring these factors can lead to rejection at approval or costly redesigns. A good house plan must suit both your lifestyle and the local building environment.

County Variations: Set-Backs, Coverage, Storey Limits (What to Confirm)

Each Kenyan county has specific zoning laws that determine how and what you can build. Some limit how close your house can be to the road or neighbour’s fence (set-backs), while others control how many storeys you can go or the percentage of land your building can cover.

Before finalising your plan:

  • Visit or call your county planning office to confirm current rules.
  • Check plot coverage limits — common standards are 30–50% depending on zone.
  • Ask about building height limits and road surrender requirements.

Understanding these early saves you time and avoids rejected drawings.

Site Factors: Slope, Soil, Access Road and Utility Availability

A plan that works on flat land may fail on sloped terrain. Your architect must inspect the site and design according to its natural topography and soil strength. Building on unstable soil without adjustments could lead to foundation cracks or water drainage issues later.

Also, confirm that your plot has road access, drainage, and nearby utility lines. Adjust your plan to match the location of water, electricity, and sewer systems. This reduces unexpected construction costs during installation.

Common Mistakes When Choosing House Plans Kenya (Quick List + Examples)

Many Kenyans rush to choose beautiful designs online without checking practicality or cost. These mistakes lead to wasted space, discomfort, and unnecessary expenses. Avoiding them helps you choose a buildable house plan that truly fits your lifestyle and budget.

Picking a Plan That Doesn’t Match Day-to-Day Lifestyle (Scale, Flow)

A plan that looks stylish may not support how your family actually lives. If you love hosting guests, you need open living areas. If you work from home, an office space becomes essential. Always match your plan’s layout to your daily routines.

Ask yourself:

  • How many people live in your home regularly?
  • Do you prefer open-plan or separated spaces?
  • Will your needs change in the next 5–10 years?

Ignoring Furniture, Storage and Circulation Needs (Furniture Mockups)

Many homeowners only realise later that their living room can’t fit standard furniture or that bedrooms feel cramped. Before final approval, mock up furniture layouts on paper or digitally to ensure each room offers enough walking space and storage.

Also, think vertically — include overhead storage, wardrobes, and pantry space in the design stage. This keeps the home functional and clutter-free.

5BR Maisonette Building designs in Kenya

Prioritising Appearance Over Buildability (Complex Details = Big Cost)

A plan filled with complex roofing, curves, or unusual materials may look amazing in drawings but often costs double to construct. Builders charge more for designs that require custom formwork or imported materials.

Choose simplicity with style — a clean design is easier to build, cheaper to maintain, and still visually appealing when done right.

Legal & Approval Mistakes to Avoid (Missing from Many Guides)

Many first-time builders in Kenya skip legal checks and approvals, hoping to “fix things later.” Unfortunately, this often results in fines, stop orders, or total redesigns. Legal compliance should start before you even buy or draw your house plan.

Not Checking Title/Encumbrances Before Planning

Before any design work begins, confirm that your land ownership is clear and uncontested. If the plot has an encumbrance, dispute, or unpaid land rates, your county office will not approve the plan.

Visit the Ministry of Lands or Ardhi House for a recent title search. Confirm:

  • The title deed matches your name and ID.
  • There are no caveats, loans, or double allocations.
  • Land use zoning (residential, mixed-use, agricultural) supports your intended development.

Doing this early prevents costly redesigns or legal battles down the line.

Overlooking County Architectural Guidelines and Building Permits (How to Verify)

Each county in Kenya has its own approval requirements for house plans. Some demand environmental impact assessments, while others require NEMA clearance for larger plots or multi-unit buildings.

Before designing, confirm with your county’s planning department:

  • Whether your plot size meets zoning minimums.
  • Which drawings are needed — architectural, structural, and drainage.
  • Applicable fees and estimated approval timelines.

Skipping these checks leads to rejected applications and wasted money.

Failing to Include Necessary Statutory Set-Backs or Access Strips

Most counties require certain set-backs — the distance between your building and the boundary or road. Others demand a 3–6 m access strip to reach interior plots. Ignoring these rules results in rejections or legal demolition notices.

Always ensure your architect includes:

  • Minimum front and rear set-backs as per county zoning.
  • Proper access for emergency vehicles.
  • Space for drainage and utility connections.

These small adjustments protect your investment and ensure smooth approval.

Budgeting Mistakes Tied to the Plan Itself

Even a well-designed plan can break your finances if you underestimate the total cost. Budgeting errors often begin at the plan selection stage, where key cost drivers like finishes, roof types, or materials are ignored.

Underestimating Finishes, Services and Specialised Features (e.g., Rainscreens, Rendered Façades)

Many house plans showcase attractive facades — yet finishes like gypsum ceilings, glass balustrades, or decorative cladding can double your construction cost. Similarly, plumbing and electrical services add hidden expenses.

Before committing to a plan:

  • Ask for a finish schedule and cost estimate.
  • Consider alternative materials available locally.
  • Consult your Quantity Surveyor (QS) on feature pricing before approval.
Apartment Development in Kitengela

Not Adding Realistic Contingency for Variations (Recommended % by Plan Complexity)

Unexpected variations are part of every project. Walls move, materials run out, and market prices rise. Failing to add a contingency budget can stall your build halfway.

As a rule of thumb:

  • Add 5–10% for simple plans.
  • Add 10–15% for complex or luxury designs.
  • Keep this separate from your main construction budget.

That small cushion keeps your project on track when surprises arise.

Failing to Get an Early BOQ/Quantity Surveyor Estimate

Many homeowners skip professional cost estimates, relying only on contractor quotes. This often leads to underbudgeting and disagreements later. A BOQ (Bill of Quantities) by a qualified QS helps you understand exact material and labour needs.

Get the BOQ before breaking ground — it allows you to:

  • Compare realistic contractor quotations.
  • Track actual spending versus planned cost.
  • Avoid being overcharged for minor variations.

Technical mistakes: structural, MEP and materials coordination

Choosing a plan without structural input (unsupported spans, cantilevers)

One of the biggest technical mistakes many Kenyan homeowners make is choosing a house plan without involving a structural engineer from the start. Architects design the space layout and aesthetics, but structural engineers ensure that the building stands safely and economically. Without this input, your plan may feature unsupported spans, cantilevers that require costly reinforcements, or column placements that disrupt room flow.

When a design lacks proper structural review, the contractor often compensates on-site, adding beams or thicker slabs — which inflates your budget by thousands of shillings. Even worse, it may create long-term risks such as sagging ceilings or cracked walls. Always request your architect to collaborate with a structural engineer during the concept stage, not after approvals.

This proactive approach guarantees that your dream design remains practical, cost-efficient, and compliant with Kenyan building standards.

Ignoring plumbing and electrical routing in early layouts

Many homeowners focus so much on layout aesthetics that they forget to integrate plumbing and electrical plans early. The result? Costly demolitions during construction when electricians or plumbers must create new chases for cables, pipes, and drains. In Kenya, where walls are often made from solid masonry, such retrofits can double your labour costs.

When reviewing a plan, ensure your architect includes provisions for electrical conduits, lighting points, socket distribution, and water or waste pipe routing. For multi-storey homes, vertical alignment of plumbing stacks and access panels can save major costs later.

Early coordination between the architect and MEP (Mechanical, Electrical, Plumbing) experts prevents rework and ensures the home operates efficiently once built. This step also helps during approvals, since county engineers often review MEP coordination drawings before issuing a permit.

Picking materials unavailable locally or costly to import

Another overlooked issue in Kenyan home design is using materials that look great online but are difficult to source locally. Many imported façade panels, tiles, roofing systems, or glass products appear affordable on paper but attract heavy shipping, customs, or scarcity-related markups. These hidden costs can derail an otherwise well-planned project.

Always consult your contractor or quantity surveyor to confirm that every material specified in your plan — from roofing profiles to paint finishes — is available locally. If it isn’t, identify alternatives with similar performance and durability.

Additionally, Kenya’s diverse climates require thoughtful material selection. For instance, timber performs well in cool highland regions but warps quickly in coastal humidity. Locally manufactured materials not only save money but also simplify repairs and maintenance.

Site-related design mistakes (sun, wind, drainage, access)

Wrong orientation — heat gain, natural ventilation and sunlight mistakes

Orientation plays a critical role in how comfortable and energy-efficient your house will be. In Kenya, where sunlight and heat vary widely between regions, a poorly oriented home can feel unbearably hot or dimly lit. Many homeowners select ready-made plans that don’t align with their plot’s sun path or prevailing wind direction.

A good orientation maximises natural light while minimising overheating. For example:

  • Align living areas to face north or east for soft daylight.
  • Limit west-facing glass to avoid evening glare and heat buildup.
  • Place bedrooms on cooler sides and allow cross ventilation through windows on opposite walls.

By positioning your plan correctly, you reduce the need for fans, air conditioning, and artificial lighting — saving both energy and money.

Poor site drainage, ignoring soakaways and runoff control

Ignoring proper drainage planning is one of the fastest ways to ruin an otherwise perfect house design. When heavy rains hit, water accumulation around foundations leads to dampness, cracks, and even flooding. Unfortunately, many plans fail to include soakaways, perimeter drains, or graded pavements.

Drainage should be addressed right from the site plan stage. Ensure the ground slopes gently away from the house, and integrate stormwater management solutions like gutters, drain channels, and collection pits. For sloped plots, contour mapping and retaining walls might be necessary to guide runoff safely.

Investing in a drainage design may seem like a small detail, but it prevents costly structural repairs later.

house designs and plans in kenya

Access and parking mismatch with plan’s entry/garage design

A common practical oversight is failing to match the house plan’s entry and garage layout to the actual site access point. Many imported or generic plans place garages or driveways on the wrong side of the plot, forcing awkward redesigns once construction begins.

Before committing to a plan, review the site survey and note where the main road or gate sits. Align your parking area, pedestrian path, and entry door accordingly. For narrow plots, consider a front setback that allows easy turning space without encroaching on the neighbour’s boundary.

Good access design ensures convenience, safety, and proper circulation — especially for visitors and deliveries.

Lifestyle & future-proofing mistakes (expansion, ageing in place, rental potential)

Not planning for growth: apartment conversion, granny flat, extra rooms

Your lifestyle and family needs will evolve over time. A house plan that doesn’t anticipate future expansion becomes restrictive and costly to modify later. In Kenya’s growing urban areas, many homeowners now design single dwellings that can later convert into apartments, Airbnb units, or family extensions.

When reviewing a plan, ask your architect to make structural allowances for vertical or horizontal expansion. Examples include:

  • Reserving space for a future stairway or lift.
  • Designing column spacing that supports another storey.
  • Allowing a detached guest wing or DSQ for future rental use.

This forward-thinking design saves future demolition costs and increases long-term property value.

Accessibility and ageing-in-place features to include early

Designing for accessibility from the start ensures your home remains functional as you age or host elderly relatives. Features like wider doors, step-free entryways, and handrails in bathrooms may seem minor but add significant comfort and safety.

In Kenyan homes, where multi-level designs are popular, consider locating a full bedroom and bathroom on the ground floor. Avoid steep stairs, provide good lighting, and use non-slip floor materials. These thoughtful choices reduce long-term mobility challenges and make your home adaptable to different life stages.

Designing for rental or resale: durable finishes and efficient layouts

If you plan to rent or sell the home in the future, durability and efficiency are everything. Potential tenants or buyers look for quality finishes, functional layouts, and easy maintenance. A poorly designed plan with narrow corridors, dark rooms, or wasted spaces reduces your home’s appeal and value.

Opt for durable materials like high-grade paint, steel balustrades, and ceramic tiles that withstand heavy use. Open-plan living areas and adequate natural lighting make smaller spaces appear larger — a major plus in Kenya’s rental market.

Homes designed with maintenance and flexibility in mind not only attract better tenants but also command higher resale prices when you decide to sell.

3 Bedroom Bungalow House Design in Kenya

How to Evaluate a Plan Quickly — A Buyer’s Checklist (Practical & Printable)

Choosing the right house plan doesn’t have to feel overwhelming. With a clear, step-by-step checklist, you can review a design confidently and avoid costly mistakes. Whether you’re buying a ready-made plan online or commissioning a local architect, evaluation helps you confirm that the plan fits your site, lifestyle, and budget before paying.

This section provides a 20-point checklist to guide you through every critical consideration — from site conditions to flow, services, and approvals — plus a simple way to visualise your furniture layout at home.

20-Point Checklist (Site, Services, Flow, Approvals, BOQ, Warranty) — Downloadable Worksheet CTA

Before committing to any house plan, take time to go through this 20-point buyer’s checklist. It ensures that you evaluate the plan beyond just appearance, saving both time and money.

Site & Location:

  • Confirm plot size and shape against plan footprint.
  • Check soil type and slope — affects foundation cost.
  • Verify setback requirements with your county office.
  • Assess road access and drainage flow.

Design & Flow:

  • Ensure living areas have natural light and cross-ventilation.
  • Confirm privacy zones — bedrooms away from noise.
  • Evaluate kitchen, storage, and circulation space.
  • Confirm stair positioning for ease and safety.

Utilities & Services:

  • Check water and power connection points.
  • Include drainage, soakaways, and rainwater systems.
  • Ask for integrated plumbing and electrical layouts.

Approvals & Documentation:

  • Confirm architect registration with BORAQS.
  • Verify county building permit requirements.
  • Request stamped structural drawings.
  • Check plan copyright and builder’s warranty.

Budget & Costing:

  • Ask for a Bill of Quantities (BOQ) to estimate real costs.
  • Include a 10–15% contingency for variations.
  • Confirm availability of specified materials locally.

Once you complete the checklist, shortlist 2–3 plans that align with your findings. This simple process can save you months of redesign and thousands of shillings in avoidable revisions.

How to Do a Furniture/Flow Mockup at Home (Simple Steps)

A quick furniture mockup helps you visualise how people will move through your home before building starts. Many buyers in Kenya skip this step — only to realise later that hallways are tight or furniture doesn’t fit comfortably.

Here’s a simple method:

  1. Print your chosen floor plan to scale (or use an app like Canva or RoomSketcher).
  2. Cut out scaled paper pieces representing your furniture — beds, sofas, tables.
  3. Place them over the plan and move them around to simulate real arrangements.
  4. Walk mentally through each space — is movement smooth? Are doors and windows positioned logically?

This simple exercise reveals flow issues, dead corners, or awkward access points that may need redesign before construction. If you’re buying a ready plan online, ask the designer for a 3D walkthrough or an editable layout to test your arrangement.

maisonette designs

Who to Involve and When: Professionals and Their Roles

Building a home in Kenya requires several specialists — each with distinct expertise and legal responsibilities. Knowing who to hire and when ensures smooth coordination, avoids duplication, and keeps your project compliant with national and county regulations.

Engaging the right professionals early prevents expensive redesigns, structural failures, or rejected permits. Below is a guide to help you understand what each expert contributes and when to bring them onboard.

Architect vs Drafter vs Structural Engineer vs QS vs Building Inspector — Responsibilities and Timing

Each professional has a unique role in your building journey:

  • Architect – Designs the concept and prepares floor plans, elevations, and sections. They also handle approvals and aesthetic coordination. Hire them first.
  • Drafter – Prepares technical drawings based on the architect’s concept. They’re useful for small projects but must work under a registered architect.
  • Structural Engineer – Ensures the design is safe and stable. They calculate beams, columns, and foundation sizes. Involve them once the floor plan is finalised.
  • Quantity Surveyor (QS) – Provides cost estimates (BOQs) and helps track expenses during construction. Hire before you start foundation work.
  • Building Inspector – A county official who checks site safety, material quality, and plan compliance at each stage. Engage them from the first foundation inspection.

By coordinating these experts, you ensure that every stage — design, costing, and construction — aligns seamlessly, reducing delays and rework.

When to Hire a Lawyer and When to Use Escrow for Land and Plan Approvals

A lawyer is your first line of defense when acquiring land or dealing with architectural contracts. Before purchasing any house plan or property, have your lawyer verify ownership, title deed status, and encumbrances through the Ministry of Lands. This prevents fraud or disputes later.

For high-value projects or online purchases, using escrow services is safer than direct payments. Escrow holds your money securely until the land transfer or approved plans are verified, protecting both buyer and seller.

Lawyers also assist in drafting agreements with architects, contractors, or developers, clarifying deliverables, timelines, and liability clauses. This is especially critical if your project involves multiple parties or joint ownership.

Buildability & Contractor Considerations Tied to the Plan

Even the most attractive house plan in Kenya can fail during construction if it’s not practical to build with local resources or skills. “Buildability” refers to how efficiently a design can be constructed — and it directly affects your cost, timeline, and final quality. When reviewing a plan, always assess whether it aligns with your contractor’s capacity, available materials, and the tools or machinery in your region.

Match Design Complexity to Contractor Skill Set (How to Check)

One of the top reasons projects stall or exceed budget is because the contractor isn’t familiar with the plan’s technical requirements. Complex cantilevers, curved façades, or intricate roofing may look stunning in renderings but require specialised expertise, accurate formwork, and skilled supervision.

Before hiring, review your contractor’s past projects. Visit completed sites, check references, and confirm whether they’ve built homes similar to yours in design and scale. Ask specific questions like:

  • Have you handled reinforced concrete slabs or multi-level houses?
  • Do you work with an in-house structural engineer?
  • How do you ensure quality control and cost tracking?

A good contractor should explain how they’ll execute each part of the plan safely and efficiently. Matching skills to design complexity helps you avoid rework, delays, and inflated labour costs.

Local Material Sourcing: Reduce Import Surprises

Many plans specify finishes or systems that aren’t readily available in Kenya — such as imported roof shingles, glass panels, or composite claddings. Relying on imported materials exposes you to unpredictable exchange rates, shipping delays, and customs fees.

To keep costs stable, discuss local substitutes with your contractor or quantity surveyor. Kenya now has a wide range of affordable local materials that mimic imported aesthetics — like stone-textured wall panels, coloured roofing sheets, and terrazzo flooring. These not only save you money but also make maintenance easier.

Always request a materials list early in the project. That way, you can confirm availability with suppliers before work begins and avoid last-minute substitutions that may affect quality.

Simple Design Alternatives That Save Money with Similar Aesthetics

A smart builder knows that beauty doesn’t always mean complexity. You can achieve modern aesthetics with simpler forms that are cheaper and faster to construct. For instance:

  • Instead of floating slabs or cantilevers, use recessed wall features for depth.
  • Replace large glass façades with smaller, shaded windows to maintain elegance while reducing cost.
  • Simplify roof geometry — a single-slope or gable roof can look just as stylish as a flat roof but costs far less to waterproof and maintain.

These subtle tweaks keep your home attractive without overwhelming your builder or budget. Always balance visual appeal with practical buildability to ensure smooth progress from design to completion.

Red Flags in Stock or Downloaded Plans (When a Cheap Plan Is Actually Expensive)

Online or stock house plans can seem like a shortcut, especially when offered at low prices. But many of these generic designs end up costing far more once adapted to Kenyan standards. Always review such plans carefully — the cheapest download may lead to the most expensive build if critical details are missing or incompatible with your site.

Missing Site Adaptation, Inadequate Sections/Elevations, No Foundation Detail

One major red flag is when the plan lacks site-specific adaptation. A design intended for flat terrain may fail completely on sloped or clay soil plots. Without proper foundation details, your contractor might “guess” footing depths — a dangerous and expensive gamble.

Also, incomplete sections or elevations mean the drawings don’t show wall heights, beam positions, or roof slopes. These omissions cause confusion on-site, leading to inconsistent dimensions and rework. Always insist that your architect or engineer reviews any downloaded plan and adjusts it to your site’s soil type, slope, and drainage.

Before paying, request full sets of structural and foundation drawings — not just floor plans.

No Allowances for Services or Furniture — What to Require Before Buying

Another warning sign is when plans don’t show utility or furniture layouts. Many online templates skip plumbing and electrical provisions entirely, leaving contractors to improvise — which can lead to unsafe wiring, pipe clashes, or poor ventilation.

Before purchasing a ready-made plan:

  • Ask for a version that includes plumbing, electrical, and drainage drawings.
  • Ensure there’s space for standard furniture in all rooms.
  • Confirm window placements allow for wardrobes or bed arrangements.

Plans missing these basics force redesigns later, wiping out the savings you thought you were making. Always verify these details or hire a local architect to add them before county submission.

How to Get Approvals Faster (Practical Steps & Common County Forms)

Navigating Kenya’s county approval system can be tedious, but a well-prepared submission can cut waiting times dramatically. Each county has its specific checklist, but the core requirements remain similar. The goal is to provide complete, stamped documents the first time — eliminating back-and-forth delays.

Standard Submission Documents (Survey, Title, Drainage Plan, Structural Drawings)

When applying for building approval, ensure your submission includes all key documents upfront. Typical requirements include:

  • Survey Map (from licensed surveyor) showing exact boundaries.
  • Title Deed or Lease Document to confirm ownership.
  • Architectural Drawings signed by a registered architect.
  • Structural Drawings signed by a structural engineer.
  • Drainage and Wastewater Plan for environmental compliance.
  • Land Rate Clearance and Application Form (available from your county offices).

These documents must be submitted digitally through the e-construction portal (in counties like Nairobi, Kiambu, and Mombasa) or physically for manual approval in others. Having all signatures and stamps ready before submission significantly shortens the approval cycle

Common Reasons Plans Get Rejected and How to Preempt Them

Most rejections arise from avoidable errors — incorrect plot numbers, missing signatories, or designs that violate zoning or setback rules. Another common issue is submitting drawings that don’t match the site survey, especially when land beacons are misplaced or overlapping.

To avoid these pitfalls:

  • Confirm zoning classification and allowed land use before designing.
  • Cross-check beacon positions with your surveyor.
  • Ensure your architect and structural engineer sign all sheets.
  • Attach NEMA or water authority clearances if applicable.

Some counties also reject plans for using outdated forms or submitting soft copies without the official approval code. Double-check submission requirements for your specific county and consult the planning department if unsure.

Conclusion — choose wisely, save money and time

Selecting the right house plan in Kenya goes beyond liking a façade — it’s about matching beauty with buildability, compliance, and practicality. A well-chosen plan saves you from hidden structural costs, approval delays, and lifestyle regrets once construction starts. By taking time to compare designs, consult an architect or QS, and verify that your preferred plan suits your site and county regulations, you protect both your budget and peace of mind.

Before committing, shortlist at least three plans, have them reviewed by a professional, and request a cost breakdown (BOQ) to confirm affordability. Whether you’re buying online or from a local designer, always demand full drawings — floor plans, elevations, sections, and service layouts — before paying.

Call to action:

Download our free printable checklist to evaluate your top three house plans side by side. It’s the simplest way to save money, avoid rework, and ensure your dream home starts right — from the plan up.

Spread the love

Leave a Reply

Your email address will not be published. Required fields are marked *

+0
Select your currency
KES Kenyan shilling